The virtual chassis is not formed after detached and attached 100G optics on QFX VC link. Initially it was working fine but after detached and attached that optics, VC doesn't get formed.This is a software bug which has been fixed through PR1754838. This KB describes the details of this issue.
root@QFX-A> show chassis hardware | match 52 Xcvr 52 REV 01 740-061000 AAAAAAAAAAAAA QSFP28-100G-CU1M labroot@QFX-B> show chassis hardware | match 52 Xcvr 52 REV 01 740-061000 AAAAAAAAAAAAA QSFP28-100G-CU1M
root@QFX-A> show virtual-chassis vc-port localre: -------------------------------------------------------------------------- Interface Type Trunk Status Speed Neighbor or ID (mbps) ID Interface PIC / Port 0/52 Configured -1 Down 100000
root@QFX-B> show virtual-chassis vc-port localre: -------------------------------------------------------------------------- Interface Type Trunk Status Speed Neighbor or ID (mbps) ID Interface PIC / Port 0/52 Configured -1 Down 100000